OEM cooperation
From Concept to SOP
Five stages, each with defined deliverables and an indicative duration.
| Stage | Deliverables | Typical duration |
|---|---|---|
| 1. Requirement freeze | Specification, ASIL allocation, standards list, interface definition | 2–4 weeks |
| 2. A-sample | Functional prototype, bench validation, CAN matrix draft | 10–14 weeks |
| 3. B-sample | Design for manufacturing revision, thermal validation, EMC pre-scan | 12–16 weeks |
| 4. DV / PV | Design verification and product validation reports, EMC and environmental testing | 14–20 weeks |
| 5. SOP | Series production, PPAP documentation, capacity ramp | Per programme |
- Durations are indicative and depend on scope.
- CAN matrices, safety documentation and test reports are exchanged under NDA.